Thursday, October 24, 2013

Floor Replacement - 2

Driver side floor repairs and sub-frame connectors.
 Sub frame connectors being fabricated from 2" tick wall square tube.

 Rusted floor and outer torque box removed.
 Sub-frame connector - drivers side.
 New torque box - drivers side.
 New long floor pan - passenger side.
New toe board lower firewall section - passenger side.